Inquiry
Form loading...
Capsule House Installation Guide

News

Capsule House Installation Guide

2025-01-09

1.Planning & Preparation

1.1 Site Selection & Assessment 

Choose a level, stable site with good access for delivery and future residents.
Ensure access to essential utilities (water, electricity, sewer, internet).
Avoid flood-prone areas and consider local climate conditions.
Analyze soil conditions and check for underground utilities.

图片5.png

1.2 Permits & Approvals 
 Obtain necessary building permits, zoning permits, and environmental permits.
 Consult with local authorities to understand and comply with all regulations.
1.3 Site Preparation 
 Clear the site of vegetation, debris, and obstacles.
Level the ground to create a stable foundation base.
Prepare trenches or conduits for utility lines.
Compact the soil to prevent future settling.
1.4 Tools & Materials 
Gather necessary tools (measuring tapes, levels, safety gear) and materials (foundation materials, utility connection materials).

2. Foundation Installation
2.1 Foundation Type Selection 
Choose the appropriate foundation type (concrete slab, pier and beam, screw piles) based on site conditions and local regulations.
Consult with a geotechnical engineer for site-specific recommendations.
2.2 Foundation Construction 
Construct the foundation according to the chosen method and local building codes.
Ensure proper drainage and support for the capsule house.

3. Capsule House Delivery & Positioning
3.1 Transportation 
Coordinate with a specialized transportation company for safe and efficient delivery.
3.2 Positioning 
Carefully position the capsule house onto the prepared foundation using cranes or heavy machinery.
Ensure proper leveling and alignment.

4. Utility Connections
4.1 Electrical Connections 
Hire a licensed electrician for all electrical work.
Connect to the main electrical panel and install appropriate circuit breakers.
Ensure proper grounding and safety measures.
4.2 Plumbing Connections 
Connect to the water supply and sewer line.
Install gas lines (if applicable) according to safety regulations.
4.3 Other Utilities 
Connect to internet, phone, and other necessary utilities.

5. Interior & Exterior Finishes
5.1 Interior Finishes 
Complete interior finishes such as flooring, cabinetry, and wall coverings.
5.2 Exterior Finishes 
Install siding, roofing, and any other exterior finishes.
5.3 Landscaping 
Complete landscaping around the capsule house.

6. Final Inspections & Occupancy
6.1 Final Inspections 
Conduct final inspections by building inspectors to ensure compliance with all codes and regulations.
6.2 Utility Testing 
Test all utilities (electricity, water, gas, etc.) to ensure proper functionality.
6.3 Safety Checks 
Conduct final safety checks, including smoke detector and carbon monoxide detector tests.
6.4 Occupancy Permit 
Obtain an occupancy permit from the local building department.
6.5 Move-In 
The capsule house is now ready for occupancy.

7. Maintenance
✧7.1 Regular Inspections: Regularly inspect the capsule house for any issues (leaks, cracks, etc.).
✧7.2 Utility Maintenance: Regularly check and maintain utilities (electrical systems, plumbing, HVAC).
✧7.3 Exterior Maintenance: Clean and inspect the exterior of the capsule house regularly.
✧7.4 Roof Maintenance: Inspect and maintain the roof to prevent leaks.
✧7.5 Pest Control: Take steps to prevent pests from entering the capsule house.
✧7.6 Professional Maintenance: Schedule regular professional maintenance for HVAC systems and other major appliances.