Affordable Chinese style villas architecture for countryside
Product introduction
Light steel structure house, with light steel as the keel, after accurate calculation and accessories combination, to achieve a reasonable bearing capacity, instead of the traditional way of house construction. It is flexible in space and shape, easy to build, and comes in a variety of forms.
Light steel structure house, with light steel as the keel, after accurate calculation and accessories combination, to achieve a reasonable bearing capacity, instead of the traditional way of house construction. It is flexible in space and shape, easy to build, and comes in a variety of forms.
Compare items | Light Steel | Wooden | traditional |
Structural performance | Earthquake:>8 | Earthquake: =8 | Earthquake: 6~8 |
Soundproofing | >65 decibel | ≈50 decibel | ≈60 decibel |
Moisture resistance | Maintain a relative humidity of 30%~60% in the room | Maintain a relative humidity of 60%~80% in the room | Maintain a relative humidity of 40%~70% in the room |
Insect and ant proof | Best | Poor | Better |
Construction period | 35~45days | 45~60days | 6~7 month |
Recycling rate | 100% | 90% | 5% |

Samples

Details

Features
1)More than 80% material are green and recycled product, Nearly zero construction material.
2)Installation: The average is one worker one day install 30 SQM. Saving 2/3 working time compared with traditional construction way, easy for installation.
3)Lifetime for structure: 30-50 years.
4)Earthquake resistance: Max. More than 8 grades.
5)Wind resistance: Max 40m/s.
6)Fire resistance: All the materials reached B1 level fire rating.
7)High acoustic insulation: 60dB of exterior wall 40dB of interior wall
8)Insect prevention: Free from the damages by insects, such as white ants
9)People can enjoy the warm in the winter and cool in summer in the house, and live more comfortably.
FAQ
Q1. Can the steel building be installed by yourself?
A: Certainly you can. The construction is a simple bolt-together process, which is easy if you have the needed access equipment. Every steel building we make comes with bolts, screws, downspouts, gutters, flashing, and clear instructions as to show you where everything is to be installed. And we will provide the installation drawing to you for reference.
Q2. What should be prepared for the site before installation?
A: You will need concrete piers for the columns to sit upon. Most people pour a full foundation, but if your steel building is on a farm or ranch and there will be dirt, gravel, or sawdust on floors, a pier system may be preferable. In these situations, the popular option is to combine piers with a concrete footing around the perimeter of the building.
Q3. Do we have a recommended foundation and associated drawing?
A: Yes, we will provide the foundation drawing and the installation drawing for you after shipment. But the foundation drawing is just for reference because the land and the soil are different in different countries.
Q4. What information should we offer before you quote?
You have the drawing, pls give us and tell us the material you use.
If no drawing, pls tell us the usage and the size of the house, then we design for you with the good price.
Q5. How long can the product be used
Container products generally have a service life of about 15-20 years, and the local climate environment is not at the same time, it will affect the service life
Q6. ls there an installation manual for this product?
Yes, There are installation instructions, and we will also provide short installation videos for customers to learn about
Q7. What is the delivery time?
We can delivery the goods about 25-45 working days after payment.
Q8. How is your after-sales service?
1. Any question, welcome to contact us. 24 hours available for you.
2. One order, one special person to follow the whole production.
3. For the house install, we will give you the 3D install drawing. If you need, we also can send you an engineer to teach your workers, but you have to charge the double ticket, accommodation, food and salary.
2. One order, one special person to follow the whole production.
3. For the house install, we will give you the 3D install drawing. If you need, we also can send you an engineer to teach your workers, but you have to charge the double ticket, accommodation, food and salary.
description2